<thead id="axwrv"></thead>
              1. <form id="axwrv"><ul id="axwrv"><pre id="axwrv"></pre></ul></form>

                news

                Product

                Contact us

                Liaoyang Petrochemical Machinery Design and Manufacturing Co., Ltd.

                Address: Section 2, South Ring Street, Hongwei District, Liaoyang City, Liaoning Province

                Landline: 0419-3666888, 3666338

                Email: lyshjx@163.com

                Website: m.forestridgetoypoodles.com


                Summary of the advantages and disadvantages of cold drawn steel pipe and extraction method

                Your current location: Home >> News >> company news

                Summary of the advantages and disadvantages of cold drawn steel pipe and extraction method

                Date of release:2018-09-27 Author: Click:

                Advantages of cold drawn steel pipe:

                (1) The size is accurate and the tolerance is small;

                (2) When the die hole is processed well and the lubrication is good, the surface quality of the steel pipe is good, and the finish can reach seven grades;

                (3) It can be used to produce steel pipes of small diameter and special section;

                (4) Since the cold working contributes to the grain refinement of the metal, and the corresponding heat treatment system, a steel pipe with good comprehensive mechanical properties can be obtained;

                (5) The equipment is simple, the production method is flexible, and the replacement is convenient.

                Disadvantages of cold drawn steel pipe: small deformation, slow speed, large metal consumption, complicated production process and high cost.

                Drawing method of cold drawn steel pipe

                The most commonly used method for drawing cold drawn steel tubes is coreless drawing (empty drawing) and short mandrel drawing. When the long mandrel is drawn, the tube and the long core are simultaneously passed through the die hole. Compared with the short mandrel drawing, the frictional force of the pipe on the contact surface with the long mandrel is significantly reduced, the deformation resistance is high, and the inner surface is lubricated. For small diameter steel pipes with difficulty, the long core rod can be drawn with a larger wall thickness reduction factor, but after the drawing, the stripping process and a series of rod removing devices are added. This method is only needed when it is especially needed. use.


                The address of this article:http://m.forestridgetoypoodles.com/en/news/375.html

                Key word:

                Recently browse:

                Liaoyang Petrochemical Machinery Design & Manufacturing Co., Ltd. All rights reserved. Yingkou Zhongchuang Network Technology Co., Ltd. provides technical support.

                免费看成人国产一区二区三区,不卡的av在线系列,亚洲欧美人人超碰,国产成人愉拍免费视频
                <thead id="axwrv"></thead>
                          1. <form id="axwrv"><ul id="axwrv"><pre id="axwrv"></pre></ul></form>